TECHNOFIT focus and work hard to develop as a genuine engineering service provider in the power generation industries.

‮‮‮‮‮‮‮‮‮‮‮‮‮‮

As year moving ahead, TECHNOFIT was developed and establish themselves as a reputable engineering service provider in the market. With 100% commitment towards a contract and exceeding client expectation as a benchmark, we are looking forward to enhance our existence in the market. 

‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮

For the first 10 years in the business, the organization work hard to ensure the skill and expertise are proven. With average annual turnover of RM 10 million, now is gearing ahead for the 2nd stage of company development. With a paid up capital of RM 2 million and a target of annual turnover of RM20 million for the next five years is prepared to move bigger.

‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮

Among TECHNOFIT's most prestigious projects are the Sultan Salahuddin Abdul Aziz Coal Fired plant (phase III) Kapar, Kerteh Aromatics KR-2, Manjung Coal Fired Power Plant, SKS Prai Power Combined Cycle Gas Turbine, Jimah Coal Fired Power Plant and Tanjung Bin Coal Fired Power Plant Project.

TECHNOFIT’s maintenance solutions and services:

  • Power Plant Erection – Boiler Pressure Parts and Non Pressure parts

  • Plant Maintenance and Services

  • Piping Fabrication and Installation

  • Mechanical Equipment – Rotary and Static

  • Structural Steel Erection
biz image4

Mechanical & Electrical Field Services

  • Annual DOSH Inspection

  • Boiler Tube Leak Repair

  • Sootblower Maintenance Services

  • Mill Grinding Journal Dismantling and Reinstallation Works

  • Replacement, modification and servicing works for Burner inclusive of all burner accessories

  • Miscellaneous type of valve replacement, repair, servicing and lapping
biz image7

‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮

  • Supply of skilled labor for maintenance and servicing inclusive of all the working tools and consumables.

  • Piping rerouting and modifications works

  • Ducting modification and reposition works

  • Coal Handling – Receiving & discharging line , stockyard preventive and corrective works

  • Electrostatic Precipitator repair works

  • Blow tank repair works

  • Structural Platform modification works
biz image6

Civil Engineering Field Services


  • Property Facilities Management

  • Building Construction
biz image8

Project Experience :

  • Erection works for the boiler pressure & non pressure parts - 2 x 500MW for Sultan Salahuddin Abdul Aziz Power Station, Phase 3, Kapar

  • General installation works(rotary and static equipment), Kerteh Aromatics Project (KR-2)

  • Compressor and turbine installation for Malaysia Olefins Project (MOP), Kerteh
hexperience

‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮

  • Erection works for the boiler pressure and non pressure parts – 3 x 700MW for Manjung Coal Fired Plant

  • Erection of bopm piping works for Prai 350MW Combined Cycle Gas Turbine (CCGT) Power Plant, Prai.

  • Erection works for the boiler pressure and non pressure parts – 3 x 700MW Tanjung Bin Coal Fired Plant

‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮‮

  • Erection of bopm piping works for Prai 350MW Combined Cycle Gas Turbine (CCGT) Power Plant, Prai.

  • Erection works for the boiler pressure and non pressure parts – 3 x 700MW Tanjung Bin Coal Fired Plant

  • Erection works for the boiler pressure and non pressure parts – 2 x 700MW Jimah Coal Fired Power Plant

Smart Partnership :

Hayward Tyler Ltd, Luton, UK
Hayward Tyler was established in 1815. Almost 200 years later their engineering excellence places them at the forefront of pump and fluid-filled motor technology.
       